Building our Campsite / Overland Destination – Day 2

Day 2 focused on moving the last stumps out of the way and putting in more water lines and yard hydrants (spigots). The additional yard hydrants will make it more convenient when all of the campsites are occupied. The water lines for the outdoor shower and cabin also went in.

Steps for the spring include moving the porta john down from the top of the ridge and putting in gravel for the driveway, turning loop and back in camp sites. The property can now be mowed on a regular basis now and that is a win.